A single consortium has submitted a bid for the feasibility study that will define Vietnam’s North–South High-Speed Railway. The Thang Long Project Management Board opened the bid on 6 November 2026. The consultancy includes route surveys, preliminary engineering, and tender documents for future construction packages. Awarding this contract is the next key milestone as the Ministry of Construction targets a December 2027 groundbreaking.
The proposed 1,541 km line will connect Ngoc Hoi Station in Hanoi with Thu Thiem Station in Ho Chi Minh City, crossing 15 provinces and cities. The government estimates a preliminary investment of US$67.34 billion. With a design speed of 350 km/h, the railway is expected to reduce end-to-end travel time to about five and a half hours.
The route survey will identify the land required for the project
The selected consultant will survey the proposed route and identify the necessary land for the railway. These findings will guide local authorities in land acquisition and site preparation. Provincial and city authorities will manage land clearance through separate projects along the corridor. The readiness of individual sites will determine where construction can begin first.
The feasibility study will also provide a basis for reviewing engineering and investment options. Before construction begins, the project team must complete designs, obtain approvals, and select contractors for initial works. December 2027 remains the ministry’s target.
Contract division will determine bidder eligibility
The ministry is considering how to divide work among infrastructure, stations, rolling stock, and equipment. This decision will determine which firms can bid directly and which may need to join a consortium or act as suppliers. A station package could provide building contractors and specialist suppliers with a clearer route to market, while a combined package for track, power, and signalling would require bidders to coordinate multiple disciplines from the start.
The first construction tender notices will provide details beyond the headline project value. They will specify which sections or facilities will be prioritized, the scope of each contract, and the required bidder experience. Until these notices are released, the feasibility consultancy award and local land clearance plans remain the main indicators of progress toward the December 2027 target.

